1. Penstock pipe for 3000 KW hydropower station with a flow of 9m3/s and a head of 45m. Material should be GRP with internal diameter of not less than 1,400mm. Total Pipe: 10 Lengths of 12m
2. Low pressure FRP pipe to covey 10m3/s of water for 600m with a head difference of 10m. Total pipe: 60 lengths of 12m with internal diameter not less than 1,600mm.
Kinly quote for delivery to Douala, Cameroon.